Guide: Managing Electrification in Occupied Facilities
  1. The “Invisible Construction” Standard

In schools and housing, construction cannot stop operations.

  • Zone-Based Execution: We isolate one “riser” or “wing” at a time.
  • The 48-Hour Rule: Legal notice is 48 hours, but effective notice is 2 weeks. We recommend “Town Hall” style meetings for residents before tools ever touch the site.
  1. Domestic Hot Water (DHW) Challenges

Replacing gas boilers with Heat Pump Water Heaters (HPWH) requires distinct engineering:

  • Recovery Rates: Heat pumps heat water slower than gas. Storage volume must typically increase by 20–30% to handle morning shower peaks.
  • Thermal Robbing: HPWHs suck heat from the surrounding room. If placed in a basement, they can unintentionally freeze nearby pipes if not ducted properly.