- The “Invisible Construction” Standard
In schools and housing, construction cannot stop operations.
- Zone-Based Execution: We isolate one “riser” or “wing” at a time.
- The 48-Hour Rule: Legal notice is 48 hours, but effective notice is 2 weeks. We recommend “Town Hall” style meetings for residents before tools ever touch the site.
- Domestic Hot Water (DHW) Challenges
Replacing gas boilers with Heat Pump Water Heaters (HPWH) requires distinct engineering:
- Recovery Rates: Heat pumps heat water slower than gas. Storage volume must typically increase by 20–30% to handle morning shower peaks.
- Thermal Robbing: HPWHs suck heat from the surrounding room. If placed in a basement, they can unintentionally freeze nearby pipes if not ducted properly.